The 25mm thick major steel tube is pushed With all the end shut by a metal shoe. On achieving the needed driving resistance, a complete length cage is lowered in to your tube and filled with significant slump concrete. The tube is then vibrated out leaving a shaft of concrete. https://cast-in-situ-piles-in-ban67542.angelinsblog.com/32057070/how-much-you-need-to-expect-you-ll-pay-for-a-good-cast-in-situ-piles